13 October 2026
Iliana Portugues
6,329 MW granted on 1 October, zero operating, and the four gates in between.
Red Electrica’s 1 October map: 6,329 MW granted to AI, zero operating. Four approvals now stand between a grid grant and the switch-on. Issue 45 walks all four, names the five European utilities supplying them, and the Q2 2027 test is ahead.
Unlock the full insight
Sign in or create an account to access member insights, or view plans for your organization.