€3.3 Billion to Energise What 2020 Granted on Paper
Red Electrica’s 1 October map: 6,329 MW granted to AI, zero operating. Four approvals now stand between a grid grant and the switch-on. Issue 45 walks all four, names the five European utilities supplying them, and the Q2 2027 test is ahead.